Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 24 results ...

Ajayi, S O (2017) Design, procurement and construction strategies for minimizing waste in construction projects, Unpublished PhD Thesis, Bristol Enterprise, Research and Innovation Centre , University of the West of England, Bristol.

Akinade, O O (2017) BIM-based software for construction waste analytics using artificial intelligence hybrid models, Unpublished PhD Thesis, Department of Business and Management , University of the West of England, Bristol.

Alaka, H A (2017) 'Big data analytics' for construction firms insolvency prediction models, Unpublished PhD Thesis, Faculty of Business and Law , University of the West of England, Bristol.

Asah-Kissiedu, M (2019) Development of an integrated safety, health and environmental management capability maturity model for Ghanaian construction companies, Unpublished PhD Thesis, Department of Architecture and Built Environment , University of the West of England, Bristol.

Baba, A (2013) Developing a decision support framework for low carbon housing design and delivery in the UK, Unpublished PhD Thesis, Department of Architecture and Built Environment , University of the West of England, Bristol.

Balogun, T B (2018) Integrating bridge maintenance life cycle assessments into bridge design for improved sustainable decision making, Unpublished PhD Thesis, Department of Architecture and Built Environment, University of the West of England, Bristol.

Chidiobi, C (2022) Development of frameworks for the management of materials procurement and construction waste for Nigerian contractors, Unpublished PhD Thesis, , University of the West of England, Bristol.

Clark, P I (2011) CDM regulations: safety targeted assessment through gateway evaluation (stage) approach, Unpublished PhD Thesis, , University of the West of England, Bristol.

Dwairi, S (2018) Development of an Ontology-based framework and tool for Employer Information Requirements (OntEIR), Unpublished PhD Thesis, Department of Architecture and Built Environment , University of the West of England, Bristol.

  • Type: Thesis
  • Keywords: building information modelling; collaboration; documentation; interview; maintenance; productivity; stakeholders; supplier; UK
  • ISBN/ISSN:
  • URL: https://uwe-repository.worktribe.com/output/858766
  • Abstract:
    The identification of proper requirements is a key factor for a successful construction project. Many attempts in the form of frameworks, models, and tools have been put forward to assist in identifying those requirements. In projects using Building Information Modelling (BIM), the Employer Information Requirements (EIR) is a fundamental ingredient in achieving a successful BIM project. As of April 2016, Building Information Modelling (BIM) was mandated for all UK government projects, as part of the Government Construction Strategy. This means that all central Government departments must only tender with suppliers that demonstrate their capability on working with the Level-2 BIM. One of the fundamental ingredients of achieving the BIM Level-2 is the provision of full and clear Employer Information Requirements (EIR). As defined by PAS 1192-2, EIR is a"pre- tender document that sets out the information to be delivered and the standards and processes to be adopted by the suppler as part of the project delivery process. it also notes that"EIR should be incorporated into tender documentation to enable suppliers to produce an initial BIM Execution Plan (BEP). Effective definition of EIRs can contribute to better productivity; within the budget and time limit set and improve the quality of the built facility. Also, EIR contribute to the information clients get at the end of the project, which will enable the effective management and operation of the asset at less cost, in an industry, where typically 60% of the cost go towards maintenance and operation. The aim of this research is to develop a better approach, for producing a full and complete set of EIRs, which ensures that the clients information needs for the final model delivered by BIM be clearly defined from the very beginning of the BIM process. It also manages the collaboration between the different stakeholders of the project, which allows them to communicate and deliver to the client's requirements. In other words, an EIR that manages the whole BIM process and the information delivered throughout its lifecycle, and the standards to be adopted by the suppliers as an essential ingredient for the success of a BIM project. For the research to be able to achieve the aims set and the formulated objectives, firstly a detailed and critical review on related work and issues was conducted. Then the initial design of the OntEIR Framework, which introduced the new categorisation system of the information requirements and the elicitation of requirements from high-level needs using ontology was presented. A research prototype of an online tool was developed as a proof-of- concept to implement and operationalise the research framework. The evaluation of the framework and prototype tool via interviews and questionnaires was conducted with both industry experts and inexperienced stakeholders. The findings indicate iv that the adoption of the framework and tool, in addition to the new categorisation system, could contribute towards effective and efficient development of EIRs that provide a better understanding of the information requirements as requested by BIM, and support the production of a complete BIM Execution Plan (BEP) and a Master Information Delivery Plan (MIDP).

Evans, M (2013) An investigation into occupants' satisfaction in UK sustainable social housing, Unpublished PhD Thesis, Faculty of Environment and Technology , University of the West of England, Bristol.

Henjewele, C (2010) Modelling client's value for money uncertainties in PFI projects, Unpublished PhD Thesis, Faculty of Environment and Technology , University of the West of England, Bristol.

Lam, T (2017) A web-based Decision Support System to assist SMEs to broker risks and rewards for BIM adoption, Unpublished PhD Thesis, Faculty of Environment and Technology , University of the West of England, Bristol.

Love, N E (2009) Leading indicators of failure: a study of SMES in the construction sector in Wales and Scotland, Unpublished PhD Thesis, Business School , University of the West of England, Bristol.

Mahamadu, A-M (2017) Development of a decision support framework to aid selection of construction supply chain organisations for BIM-enabled projects, Unpublished PhD Thesis, Department of Architecture and Built Environment , University of the West of England, Bristol.

Meng, X (2008) Development of assessment framework for construction supply chain relationships, Unpublished PhD Thesis, School of the Built and Natural Environment , University of the West of England, Bristol.

Muhammed-Yakubu, N (2023) A BIM-based information management schema for construction activities data-flow across the project life cycle, Unpublished PhD Thesis, , University of the West of England, Bristol.

Oladejo, J (2020) An investigation in the factors affecting the implementation of health and safety management practices by contractors in Nigeria, Unpublished PhD Thesis, Department of Architecture and Built Environment , University of the West of England, Bristol.

Omar, H (2020) Towards an automated photogrammetry-based approach for monitoring and controlling construction site activities, Unpublished PhD Thesis, , University of the West of England, Bristol.

Owolabi, H (2018) Public accountability: The case of government guarantee scheme in PFI/PPP projects, Unpublished PhD Thesis, Department of Architecture and Built Environment, University of the West of England, Bristol.

Prabhakaran, A (2023) Development of interactive and distributed virtual environments for immersive communication in the furniture, fixture and equipment sector, Unpublished PhD Thesis, , University of the West of England, Bristol.

Rogan, D J (2003) Attitudes towards innovation in the construction industry: The case in the social housing sector, Unpublished PhD Thesis, , University of the West of England, Bristol.

Smith, D (2020) Rank and file union organising and employers' counter-mobilisation: The role of activists in the mobilisation of 'self-employed' construction workers, Unpublished PhD Thesis, Department of Architecture and Built Environment, University of the West of England, Bristol.

Tanabe, S (2022) A risk allocation framework for public private partnerships (PPP) water infrastructure projects in Sri Lanka, Unpublished PhD Thesis, , University of the West of England, Bristol.

Yakubu, O A (2010) Cost and time control practice of construction projects in the UK: The pursuit of effective management control, Unpublished PhD Thesis, Department of Architecture and Built Environment, University of the West of England, Bristol.